First release

Engineering & product data

One source of truth for what you make and how you make it — from a four-part table to a multi-level assembly.

What changes for your factory

  • One correct bill of materials instead of five spreadsheet versions
  • Changes reach the shop floor before the wrong part is made
  • Accurate standard costs for every product

What it does

  • Item master with revisions, a lifecycle, variants, units of measure and bilingual names Available now
  • Multi-level bills of materials with scrap factors, phantoms and alternates Available now
  • Routings with operations, work centres, setup and run times Available now
  • Step-by-step work instructions with photos and checks the operator ticks Available now
  • Standard cost roll-up from materials, labour, machines and overheads
  • Where-used, BOM comparison and spreadsheet import Available now

Who uses it

Product engineers, manufacturing engineers and document controllers.

Labels show what you can use today and what comes next. “Available now” works in the product today. “First release” marks what we are finishing for the first full release, “Version 1.0” what follows it, and “Roadmap” what comes later.

Included in every plan

Every module comes with every plan as it arrives, at no extra cost. Start your factory with a 14-day free trial.